Error: CMFBC-1 The schematic and the layout constraints were not synchronized

Hi, I am in the middle of a design and had no problem going back and forth between schematics and layout. Now I am getting the error message below. I am using Cadence 17.2.

ERROR: Layout database has probably been reverted to an earlier version than that, which was used in the latest flow or the schematic database was synchronized with another board.

The basecopy file generated by the last back-to-front flow not found.

ERROR: Layout database has probably been reverted to an earlier version than that, which was used in the latest flow or the schematic database was synchronized with another board.

The basecopy file generated by the last back-to-front flow not found.

Error: CMFBC-1: The schematic and the layout constraints were not synchronized as the changes done since the last sync up could not be reconciled. Syncing the current version of the schematic or layout databases with a previous version would result in this issue. The  constraint difference report is displayed.

Continuing with "changes-only" processing may result in incorrect constraint updates.

Thanks for your input

Claudia




cons

Create a new Constraint Group or Constraint Class ?

When in Constraint Manager, Physical Domain, one can create a new Physical Constraint Class defining specific attributes for a custom rule set. One can then assing this new rule set to a set of nets. To do that it is instructed to create a new Net Class with menu Objects > Create > Net Class. Also on that same menu is available Net Group. Both options create a group that appear in the Constraint Manager Objects Name Column. I have triied both  options and cant really see the difference. 

The Question: What is the difference between creating a Net Class and a Net Group ?  What are the implications ?

Thanks for your help.




cons

Allegro design entry DHL, pin swaps , export without exporting constraints, back annotate.

Hi,

I have a new customer that uses Allegro Design entry HDL for the schematic and have a few questions.

1. How do you get pin/gate swaps into the symbols in the schematic ?

2. How do you transfer them to the pcb editor ?

3. How do you back annotate the swaps from the pcb editor to the schematic ?

4. How do you stop the export/Import physical from updating the constraints in the pcb file ? 




cons

Wrong Constraint Values in Sequential Cell Characterization

Hi,

I am trying to characterize a D flip-flop for low voltage operation (0.6V) using Cadence Liberate (V16). This is a positive edge triggered D flip flop based on true-single-phase clocking scheme. After the characterization, the measurements reported for hold constraint arcs seem to deviate significantly from its (spectre) spice simulation.

The constraint and the power settings to the liberate are as follows : 

# -------------------------------------------- Timing Constraints --------------------------------------------------------------------------------
### Input waveform ###
set_var predriver_waveform 2;# 2=use pre-driver waveform
### Capacitance ###
set_var min_capacitance_for_outputs 1;# write min_capacitance attribute for output pins
### Timing ###
set_var force_condition 4
### Constraint ###
set_var constraint_info 2
#set_var constraint_search_time_abstol 1e-12 ;# 1ps resolution for bisection search
set_var nochange_mode 1 ;# enable nochange_* constraint characterization
### min_pulse_width ###
set_var conditional_mpw 0
set_var constraint_combinational 2


#---------------------------------------------- CCS Settings ----------------------------------------------------------------------------------------
set_var ccsn_include_passgate_attr 1
set_var ccsn_model_related_node_attr 1
set_var write_library_is_unbuffered 1

set_var ccsp_min_pts 15 ;# CCSP accuracy
set_var ccsp_rel_tol 0.01 ;# CCSP accuracy
set_var ccsp_table_reduction 0 ;# CCSP accuracy
set_var ccsp_tail_tol 0.02 ;# CCSP accuracy
set_var ccsp_related_pin_mode 2 ;# use 3 for multiple input switching scnarios and Voltus only libraries


#----------------------------------------------- Power ---------------------------------------------------------------------------------------------------
### Leakage ###
set_var max_leakage_vector [expr 2**10]
set_var leakage_float_internal_supply 0 ;# get worst case leakage for power switch cells when off
set_var reset_negative_leakage_power 1 ;# convert negative leakage current to 0

### Power ###
set_var voltage_map 1 ;# create pg_pin groups, related_power_pin / related_ground_pin
set_var pin_based_power 0 ;# 0=based on VDD only; 1=power based on VDD and VSS (default);
set_var power_combinational_include_output 0 ;# do not include output pins in when conditions for combinational cells

set_var force_default_group 1
set_default_group -criteria {power avg} ;# use average for default power group

#set_var power_subtract_leakage 4 ;# use 4 for cells with exhaustive leakage states.
set_var subtract_hidden_power 2 ;# 1=subtract hidden power for all cells
set_var subtract_hidden_power_use_default 3 ;# 3=subtract hidden power from matched when condition then default group
set_var power_multi_output_binning_mode 1 ;# binning for multi-output cell considered for both timing and power arcs
set_var power_minimize_switching 1
set_var max_hidden_vector [expr 2**10]
#--------------------------------------------------------------------------------------------------------------------------------------------------------------

I specifically used set_var constraint_combinational 2 in the settings, in case the Bisection pass/fail mode fails to capture the constraints. In my spice simulation, the hold_rise (D=1, CLK=R, Q=R) arc at-least requires ~250 ps for minimum CLK/D slew combination (for the  by default smallest capacitive load as per Liberate)  while Liberate reports only ~30 ps. The define_cell template to this flip flop is pretty generic, which does not have any user specified arcs. So which settings most likely affecting the constraint measurements in Liberate and how can I debug this issue ?

Thanks

Anuradha




cons

Delay Degradation vs Glitch Peak Criteria for Constraint Measurement in Cadence Liberate

Hi,

This question is related to the constraint measurement criteria used by the Liberate inside view. I am trying to characterize a specific D flip-flop for low voltage operation (0.6V) using Cadence Liberate (V16). 

When the "define_arcs" are not explicitly specified in the settings for the circuit (but the input/outputs are indeed correct in define_cell), the inside view seems to probe an internal node (i.e. master latch output)  for constraint measurements instead of the Q output of the flip flop. So to force the tool to probe Q output I added following coder in constraint arcs :

# constraint arcs from CK => D
define_arc
-type hold
-vector {RRx}
-related_pin CP
-pin D
-probe Q
DFFXXX

define_arc
-type hold
-vector {RFx}
-related_pin CP
-pin D
-probe Q
DFFXXX

define_arc
-type setup
-vector {RRx}
-related_pin CP
-pin D
-probe Q
DFFXXX

define_arc
-type setup
-vector {RFx}
-related_pin CP
-pin D
-probe Q
DFFXXX

with -probe Q liberate identifies Q as the output, but uses Glitch-Peak criteria instead of delay degradation method. So what could be the exact reason for this unintended behavior ? In my external (spectre) spice simulation, the Flip-Flop works well and it does not show any issues in the output delay degradation when the input sweeps.

Thanks

Anuradha




cons

Virtuosity: Are Your Layout Design Mansions Correct-by-Construction?

Do you want to create designs that are correct by construction? Read along this blog to understand how you can achieve this by using Width Spacing Patterns (WSPs) in your designs. WSPs, are track lines that provide guidance for quickly creating wires. Defining WSPs that capture the width-dependent spacing rules, and snapping the pathSegs of a wire to them, ensures that the wires meet width-dependent spacing rules.(read more)





cons

Critical XSS Vulnerability Patched In WordPress Plugin GDPR Cookie Consent




cons

Dassault Systèmes’ 3DEXPERIENCE Lab Accelerates Expansion and Consolidates Global Network to Develop Projects That Positively Impact Society

•Fifteen new disruptive projects and startups from Belgium, China, France, India, South Africa and the U.S. join the 3DEXPERIENCE Lab accelerator program •New incubator and fab lab partners including Centech in Canada and OuiCrea in China will empower early stage projects from the outset •Since 2015, the 3DEXPERIENCE Lab has evaluated nearly 500 projects and grown its network of mentors to 1,200




cons

CES 2020 Survey by CITE Research/Dassault Systèmes: Consumers Want Personalized Products but Won’t Wait for Them and Expect a Cost Benefit for Their Data

•Survey of 3,000 consumers in the U.S., China and France examines views on personalization in healthcare, mobility, retail, and home and city environments •Personalization in healthcare, prioritized over other categories, will require AI, 5G and home assistant technologies to achieve, according to respondents •Consumers will pay on average 25.3% more for personalization, but they expect a savings in return •Generation X, millennials, and Generation Z are more willing to pay and share data...






cons

Security Consultant Granted Bail After Hacking GoGet Systems









cons

Intel Fixes Severe NUC Firmware, Web Console Vulnerabilities




cons

Furukawa Electric ConsciusMAP 2.8.1 Java Deserialization Remote Code Execution

Furukawa Electric ConsciusMAP version 2.8.1 java deserialization remote code execution exploit.




cons

Verodin Director Web Console 3.5.4.0 Password Disclosure

Verodin Director Web Console version 3.5.4.0 remote authenticated password disclosure proof of concept exploit.







cons

Covid-19 likely to reverse Middle East consulting gains

Consulting firms in the Middle East are likely to take a hit in 2020 due to the coronavirus, after two strong years.




cons

Iowa officials consider energy storage tax credit, ‘value of storage’ study

Iowa economic development officials are tentatively endorsing a tax credit for battery storage to complement the state’s wind and solar generation.




cons

Giant offshore wind farm takes further steps toward construction in New Jersey

Last week, the New Jersey Board of Public Utilities announced it selected Ocean Wind, an offshore wind energy project proposed by Ørsted with support from PSEG, to develop an 1,100 MW offshore wind farm. Ocean Wind will be located 15 miles off the coast of Atlantic City. Construction is expected to commence in the early 2020s, with the wind farm operational in 2024.




cons

The failure of privatization in the energy sector and why today’s consumers are reclaiming power

Back in the 1980s and 1990s, the twin forces of privatization and deregulation of public infrastructure services ascended to a global paradigm of progress and development. Government management of services such as telecommunications, transportation, water, and energy was deemed inefficient, underperforming, and monopolistic. Private industry – accountable to the profits and losses of an open market and, thus, believed more efficient than government – was proclaimed the better way for consumer choice and a more efficient use of taxpayers’ expenses.




cons

Dominion Energy begins construction on Coastal Virginia Offshore Wind project

Dominion Energy has begun construction on the Coastal Virginia Offshore Wind (CVOW) project, which will feature two 6-MW wind turbines and power about 3,000 homes.




cons

In Michigan, Consumers sees strong interest in charging station rebates

Consumers Energy says it’s happy with the launch of its electric vehicle charging station program and open to expanding the three-year, $10 million pilot.




cons

Largest Cherokee County wind farm now under construction

After a 23-year wind farm construction hiatus, work on a 2nd Cherokee County wind farm has begun. Developed by San Diego based EDF Renewables, the 200-megawatt (MW) Glaciers Edge Wind Project north of Marcus is scheduled to be on line by the end of 2019.




cons

Brazil to support construction of four new hydropower plants

Brazil has included four hydropower plants among the projects that will receive support as part of the country's investment partnerships program, called Programa de Parcerias de Investimentos or PPI. 




cons

New Hampshire considers options for buying renewable energy for state

New Hampshire is preparing to follow the lead of other New England states and create a system for procuring renewable energy on behalf of residents.




cons

Iowa officials consider energy storage tax credit, ‘value of storage’ study

Iowa economic development officials are tentatively endorsing a tax credit for battery storage to complement the state’s wind and solar generation.




cons

The failure of privatization in the energy sector and why today’s consumers are reclaiming power

Back in the 1980s and 1990s, the twin forces of privatization and deregulation of public infrastructure services ascended to a global paradigm of progress and development. Government management of services such as telecommunications, transportation, water, and energy was deemed inefficient, underperforming, and monopolistic. Private industry – accountable to the profits and losses of an open market and, thus, believed more efficient than government – was proclaimed the better way for consumer choice and a more efficient use of taxpayers’ expenses.




cons

German Utility Secures Consumer Management of Smart Home Data

German-headquartered integrated energy company, Innogy, has selected distributed computing solutions provider, Intertrust, to help smart home consumers to securely manage data.




cons

E.ON Pilots Efficiency Funding Scheme for UK Consumers

Integrated energy company E.ON and BNP Paribas Personal Finance are piloting a new energy efficiency financing scheme for UK consumers.




cons

Constellation and Enel To Help Make Starbucks Coffee Greener in Illinois

This week Constellation, an Exelon company, said it signed a long-term PPA with Starbucks to power more than 340 Illinois stores with 100 percent renewable energy produced by Enel Green Power (EGP) North America, Inc.’s HillTopper wind project in Logan, County, Ill.




cons

In Michigan, Consumers sees strong interest in charging station rebates

Consumers Energy says it’s happy with the launch of its electric vehicle charging station program and open to expanding the three-year, $10 million pilot.




cons

Climate Talks Nearing Consensus in Behind-the-Scenes Meetings

Publicly, the United Nations climate-change talks look mired in disputes over everything from money to the length of the proposed agreement.




cons

Rwanda leases 22 small hydroelectric plants to private consortium

On Aug. 27, Rwanda’s Ministry of Infrastructure government announced it has leased 22 small hydropower projects located in the northern and western provinces to private investors to spur the country’s hydroelectric energy program. According to energy experts at the ministry, the plants would add about 24.6 MW of hydroelectric energy to the national grid. 




cons

Potsdam hydroelectric project has rehabilitation and new construction goals

According to the Federal Register, potential power is presently unutilized at the 800-kW East powerhouse and proposed 700-kW West powerhouse for the Potsdam hydroelectric project on the Raquette River in Lancaster County, New York. The proposed West powerhouse received a Federal Energy Regulatory Commission exemption from licensing in 1981.  




cons

Knight Construction wins spillway gate rehab contract for Blue River Dam

Knight Construction & Supply Co. has won a $3.7 million contract from the U.S. Army Corps of Engineers to rehabilitate spillway gates at the Blue River Dam in Oregon.




cons

Gilkes begins construction of three small hydroelectric plants in Scotland

Hydroelectric power developer Gilkes Energy has begun construction on a trio of small hydro projects, all of which are to be located on the Attadale Estate near Loch Carron, Scotland.




cons

10.6-MW Pulanai hydropower plant being constructed in Philippines suffers attack

The Philippines Department of Energy (DOE) released a report today saying its US$133.4 million 10.6-MW Pulanai hydropower plant being constructed in the southern province of Bukidnon on the Island of Mindanao, was attacked by armed individuals on Feb. 25.




cons

New Hampshire considers options for buying renewable energy for state

New Hampshire is preparing to follow the lead of other New England states and create a system for procuring renewable energy on behalf of residents.




cons

Iowa officials consider energy storage tax credit, ‘value of storage’ study

Iowa economic development officials are tentatively endorsing a tax credit for battery storage to complement the state’s wind and solar generation.




cons

In Michigan, Consumers sees strong interest in charging station rebates

Consumers Energy says it’s happy with the launch of its electric vehicle charging station program and open to expanding the three-year, $10 million pilot.




cons

Via Filling and Plugging Considerations for HDI

Presentation by Mike Carano of OMG Electronic Chemicals.




cons

Desjardins Industrials, TMT and Consumer Conference

Desjardins Industrials, TMT and Consumer Conference