power

Aha™ by HARMAN to Power Content in New Hondalink™ System

PALO ALTO, CA– Aha™ by HARMAN, the infotainment platform that makes Web content as easy to use as radio is delivering content to HondaLink, a new personalized driving experience that streams a world of information and entertainment to Honda vehicles. Tens of thousands of stations from Aha, such as audiobooks, internet radio, on-demand music, news, entertainment, personalized points of interest information, Facebook and Twitter audio newsfeeds and much more will be available free to HondaLink users. Aha will be seamlessly integrated into the HondaLink mobile app and audio system-based interface system for a unified user experience.




power

Powerball Drawing Numbers For 05/09/20: Saturday Jackpot was $68 Million

The Powerball jackpot for 05/09/20 was for $68 million, with a cash option worth $55.6 million. Here are the numbers.




power

Powerball Results, Numbers For 5/9/20: Did Anyone Win the $68 Million Jackpot on Saturday (Last) Night?

The winning numbers in Saturday night's Powerball draw were 12, 18, 42, 48, and 65. The Powerball was 19 and the Power Play was 5X.




power

Educating & Empowering Women+ in the Studio

The Producer's Lounge is an initiative designed to elevate female and non-binary-identifying music producers, engineers, and mixers from B.C. The program brings participants into some of the province's top studios to work with and learn from some of the industry's best and brightest audio pros, including internationally-heralded studio vet Sylvia Massy (Johnny Cash, Prince, Red Hot Chili Peppers), Alysha Brilla, Rae Spoon, Elisa Pangsaeng, and others.

Jane Aurora, the program's founder and an acclaimed musician, producer, songwriter, and engineer herself, joins us to talk about the initiative, some of the challenges these underrepresented groups face in launching their careers, and how they can be overcome.




power

Do not allow 'biased' election watchdog power to prosecute, say MPs

The election watchdog has revealed that it is pressing ahead with plans to hand itself powers to prosecute campaigners and political parties, putting itself on a collision course with ministers. The Electoral Commission is planning to publish a consultation setting out proposals to hand itself a "prosecutions capability", despite senior Tories insisting that the body is "not trusted to be impartial". The disclosure comes after the Metropolitan Police confirmed that it had ended investigations into Darren Grimes and Alan Halsall, two pro-Brexit campaign figures, two years after a referral by the commission for alleged breaches of spending rules. The move prompted calls for the commission to be "overhauled", with Mr Grimes describing the body as a "kangaroo court" that was not "fit for purpose". Separately, the National Crime Agency found no evidence that any criminal offences were committed by Arron Banks, another prominent Brexiteer, after another referral by the watchdog. Last night Matthew Elliott, who was chief executive of the official Vote Leave campaign, claimed that the commission's record showed that if it acquired the new powers, "there will be countless travesties of justice, and democracy will be undermined.” Sir Bernard Jenkin, the former chairman of the Commons public administration committee, said: "These proposals appear to be doubling down on a failed system. Parliament should change it." Another Conservative MP said: "I can't think of any public body that is less deserving of prosecuting powers than the Electoral Commission, who have shown themselves to be biased and, frankly, vindictive." Last year Jacob Rees-Mogg, now the leader of the Commons, and Brandon Lewis, who has also been appointed to Boris Johnson's cabinet, both expressed alarm at the watchdog's plans to hand itself powers currently exercised by the police and Crown Prosecution Service - after the move was revealed by this newspaper. The watchdog has faced repeated accusations of bias against bodies that campaigned for Brexit in 2016, which it strongly denies. The commission claims it could hand itself the powers without ministers bringing forward legislation, by altering its enforcement policy following a public consultation - due to open in the coming weeks. But MPs warned that some groups could be unfairly targeted. Speaking last year, while Tory chairman, Mr Lewis pointed out that one senior figure at the commission - the same official spearheading the proposals - had previously said that she would "not want to live under a Tory government". He suggested the body was not seen as a "fair" arbiter. As a backbencher, Mr Rees-Mogg called for the Conservatives to formally oppose the move, saying: "The Electoral Commission is not trusted to be impartial and a number of its leading figures have said very prejudicial things about Brexit." The commission's corporate plan for the period from 2020 to 2025 states: "To deter people from committing offences, and to make sure we can respond proportionally if they do, we will continue to build the capacity to prosecute suspected offences. We will consult on the way we approach the use of prosecutions." An Electoral Commission spokesman said: “Later this year we will be consulting with political parties, the police and the CPS on changes to our enforcement policy, which includes a prosecutions capability, and will bring our regulatory work in line with a wide range of other regulators. “Extending our work in this direction would enable us to bring lower order offences before the courts in a way which is swift and proportionate, freeing up the resources of the police and prosecutors and delivering more effective regulation of political finance to support public confidence.” Mr Elliott said: “The Electoral Commission’s track record at conducting investigations is woeful. "In the case of Leave campaigners ... they assumed that we were guilty until proven innocent ... Thankfully, the Metropolitan Police and Crown Prosecution Service looked at the evidence thoroughly, and saw through the conspiracy theories that the Electoral Commission had believed without question." The commission insisted it was "right that potential electoral offences are properly investigated by the appropriate authority". A spokesman said there was "no substance to allegations that the Commission is biased", saying the organisation had investigated campaigners and parties across the political spectrum.





power

NSW set to nick Adam Zampa from Vics in off-season power move

Australia’s frontline white ball spinner, Adam Zampa, is poised to leave South Australia in the off-season for a move back home to New South Wales.




power

‘Complete turd’: Legend blasted for ‘selfish’ $109M power move

The field for the Korn Ferry Challenge at TPC Sawgrass in Florida has yet to be finalised, though an early list of participants surfaced on Twitter and three-time PGA major champion Vijay Singh is among them.




power

Split innings, more free hits and powerplays: Big Bash debates radical new rules

Watch A Week With Warnie, part of a week-long pop-up channel on Foxtel and Foxtel Now, from Monday 8pm (EST)!




power

Spark plug was to blame for Vettel's power loss

Red Bull has revealed that the problem that cost Sebastian Vettel near certain victory at the Bahrain Grand Prix was in fact due to a faulty spark plug rather than a cracked exhaust




power

'I got on the power too early' - Kubica

Robert Kubica was left lamenting a poor start after finishing third in Monaco




power

Stage Set for Low Fat, Low Sugar Chocolate Powered with Fruit Juices

Parents concerned about their kids' waistlines may relax now, 'fat free chocolate' is about to become reality. Sci




power

Need Nuclear Power Plant?

NEED POWER PLANT? A PRAGMATIC APPROACH IS NEED OF THE HOUR

Electric power is a growing need in a developing...




power

Stress Vs Mind Power

Stress Vs




power

PIO-Led Team Develops Solar Nanotech-Powered Clothing

A team led by an Indian-origin scientist in the U.S. has developed filaments that harvest and store the suns energy and can be woven into textiles which can power phones, personal health sensors and other gadgets.




power

The economic empowerment of women for more productive and inclusive societies

This year’s OECD Ministerial Council Meeting (MCM), chaired by Chile, is devoted to productivity. Ministers will discuss what governments, firms and individuals can do to improve productivity with the aim of fostering inclusive growth.




power

Empowering the 40% of young Latin Americans not in formal jobs, education or training could spark new growth engines, says latest Latin American Economic Outlook

Latin America and the Caribbean’s (LAC) GDP will shrink by between 0.9% and 1% in 2016, according to the latest estimates, the second consecutive year of negative growth and a rate of contraction the region has not seen since the early 1980s. According to the Latin American Economic Outlook 2017, the region should recover in 2017, but with modest GDP growth of between 1.5% and 2%, below expected growth in advanced economies.




power

Iceland must balance growth in power and tourism industries with nature conservation, OECD says

Iceland must balance growth in power and tourism industries with nature conservation, OECD says Iceland has one of the world’s most pristine natural environments and its glaciers, volcanoes and hot underground springs bring major economic benefits via renewable energy and tourism.




power

Protecting and Empowering Consumers in the Purchase of Digital Content Products

While consumer demand for digital goods has increased rapidly in recent years, a range of challenges undermine confidence in the market and require policy attention.




power

Colombia telecoms regulator needs more power to increase competition, says OECD

Colombia has done much to strengthen the rules governing its telecommunication sector, but it must give its regulator more power to enforce them in order to increase competition, particularly in the highly concentrated mobile market, according to a new OECD report.




power

Empowering women in the digital age: Where do we stand?

New digital tools are empowering, and can serve to support a new source of inclusive global economic growth. Now is the time to take use the digital transformation to ensure it represents a leapfrog opportunity for women and a chance to build a more inclusive digital world. This brochure represents a preliminary effort by the OECD, working with the G20, to broaden the evidence base.




power

Iceland must balance growth in power and tourism industries with nature conservation, OECD says

Iceland must balance growth in power and tourism industries with nature conservation, OECD says Iceland has one of the world’s most pristine natural environments and its glaciers, volcanoes and hot underground springs bring major economic benefits via renewable energy and tourism.




power

Behold the power of fungus... and biodiversity offsets - Insights blog

When you think of biodiversity conservation, you probably think of the classic images: the polar bear, the lion, the elephant, the giraffe. The ecological community likes to call them charismatic megafauna, with only a hint of satire.




power

Power struggle: Decarbonising the electricity sector - Effects of climate policies, policy misalignments and political economy factors on decarbonisation - Environment Working Paper

This report investigates the effects of select climate policies, non-climate policies, as well as political economy factors on the decarbonisation of electricity in OECD countries from 2000 to 2015. Effects are analysed on the three phases of decarbonisation: (1) increasing the share of renewables installed, (2) increasing the use of renewables in generation, and (3) reducing the emissions from electricity.




power

Clean power for a cool planet: Electricity infrastructure plans and the Paris Agreement - Environment Working Paper

Meeting the temperature goals of the Paris Agreement requires a transformational change in our infrastructure systems. This working paper aims to shed light on the extent to which current electricity generation projects under construction at the global level - the "pipeline" - are consistent with what a low-carbon transition requires.




power

Cross-Border Trade in Electricity and the Development of Renewables-Based Electric Power: Lessons from Europe

To benefit fully from cross-border trade in electricity, interconnected countries need to establish a non-discriminatory trading regime based on co-operation and co-ordination, says this study of trade in renewables-based electric power in Europe.




power

Politics: The Game of Business & Power [Part-I]

Last night, I and my brother were watching news and suddenly he said…, “leading a luxurious life in our village is much easier than struggling for a simpler life in metro...




power

Powerful global coalition to boost equal pay for women at work - New initiative will support innovative and effective equal pay policies and practices around the globe

One of the most persistent barriers to women’s success at work and to economic growth, unequal pay, will be actively challenged by a new global partnership, the Equal Pay International Coalition (EPIC).




power

Legal and social barriers holding back women’s empowerment in Middle East and North Africa

Women in the Middle East and North Africa are better educated and better skilled than ever, yet legal and social barriers mean the share of them in work is still the lowest in the world. Bringing family and labour laws into line with gender goals would enable more women to enter employment and would make MENA economies more competitive and inclusive, according to a new OECD report.




power

OECD and AfDB launch powerful tool to help African companies prevent bribery

New guidance from the AfDB and the OECD will help African companies of all sizes set up measures to prevent bribery and improve the quality of corporate compliance and anti-bribery policies.




power

Knowledge is power: ensuring quality early childhood education and care provision (OECD Education Today Blog)

The latest report in the OECD’s Starting Strong series reviews the monitoring systems of 24 jurisdictions and reveals that monitoring does not merely encompass regulatory compliance but is moving towards better understanding what is happening inside an ECEC setting and how a child develops in several areas.




power

Empowering teachers with high-quality professional development (OECD Education Today Blog)

Exposure to high quality teacher professional development varies greatly both between and within countries, which broadens the scope of work for policy makers.




power

Archived webinar - Empowering and Enabling Teachers to Improve Equity and Outcomes for All (with Andreas Schleicher, Director for the Directorate of Education and Skills, OECD)

Despite increased funding and many reforms, most education systems are still seeking ways to better prepare their students for a world in which technological change and the digital revolution are changing the way we work, live and relate to one another.




power

Empowering teachers to improve equity and inspire learning (OECD Education Today Blog)

The expectations for teachers are high and rising each day.




power

Empowering teachers to improve equity and inspire learning (OECD Education Today Blog)

Every year in March, education ministers and union leaders of the highest-performing and most rapidly improving education systems (according to PISA) meet to seek ways to improve the status of the teaching profession. Many countries could use such guidance.




power

We must invest in the transformational power of higher education

Despite people’s perceptions of us, we economists are neither futurologists, nor historians. But we do see trends that we try to interpret, by applying objectivity where subjectivity abounds, and using the (rather few) tools we have developed to address (very many) major social problems.




power

Business brief: Empowering the next generation of scientists to change the world

Education has transformed over the last 20 years from being a means to an end to becoming a change agent on the battleground to improve the life chances of all individuals, regardless of where they live, their economic status, gender, ability or religious persuasion. Education has been revitalised as the gateway for equal opportunity.




power

Governance: The Chicago Tri-State metro area is a powerful region – policy makers must work together to maintain a global pole position and fully realise the region’s potential

Chicago is at a tipping point: despite economic strengths, it faces considerable challenges to compete in the “Premier League” of world-class cities, warns the OECD’s review of the Chicago Tri-State Metropolitan Region.




power

Executive powers show Obama’s weakness

The president will be blamed for problem arising from leniency at the border




power

Inphase Power Technologies ... vs Abb India Limited on 31 January, 2020

5 Mr. Rishi Gulati, "IGBT-based power quality compensation solutions are high Business end solution in terms of technology as compare to non IGBT Development which our company manufacturing. As per my market Manager, experience, I can say that approximately IGBT based power Cummins India quality compensation solution cost double to the customer as Ltd. compare to non IGBT base solutions. Switching speed is in nano seconds in IGBT based solutions whereas switching speed is in milliseconds in TSC or non-IGBT solutions."




power

Shyam Steel Industries Limited vs Shyam Sel And Power Limited & Anr on 28 April, 2020

2

The application has been filed on the ground of urgency that the special leave petition filed in the Supreme Court cannot be taken up immediately.

In view of the present situation, the time to comply with the order passed by the Trial Court is extended till June 30, 2020. However, this order will not be a charter for the applicant to continue manufacturing its products. Indeed, it is submitted on behalf of the applicant that no manufacturing activity is being undertaken in the present situation.

G. A. 804 of 2020 is disposed of without prejudice to the rights and contentions of the parties thereto.




power

Maghesh Kumar Singh vs National Thermal Power ... on 6 May, 2020

1. "Whether Mr. Maghesh Kumar Singh was posted by NTPC Ltd to Meja Urja Nigam Pvt. Ltd at Corporate office, Allahabad and site office Meja.

2. Whether he suffered a finger crush injury on 26-10-2013 while living in Meja Srijan Vihar Township. If yes, name of the hospital he was admitted to and surgery performed may be furnished.

3. Whether he filed a personal accident claim form in this regard. If yes; the amount for which it was sanctioned and the payment transaction details may kindly be furnished.

Page 1 of 8

4. If the above mentioned claim remains pending since 2013, reason for the same may be intimated. If any official found negligent, the action taken against him may also be intimated."




power

The £2.4m Pininfarina Battista Anniversario is one of the most expensive battery-powered cars ever

Just five examples will be built as part of a total run of 150 Battista models as the the legendary Italian styling house branches out into building its own cars bearing its name.




power

Gvk Power (Goindwal Sahib) ... vs Punjab State Power Corporation ... on 26 February, 2020

1. This is an Application seeking stay of operation of the Order dated 17.01.2020 passed by the Punjab State Electricity Regulatory Commission ("Central Commission") whereby the State Commission in Petition NO. 54 of 2017 has determined the completed capital cost of GVK's 540 MW power project located in Punjab as under:

S.No. Claimed by Recomm- Approved GVK ended by by the Ld. Joint PSERC* Auditor 1. Land 123.77 123.77 96.75 2. Preliminary Expenses 0.25 0.25 3. Boiler Turbine Generator 1050.22 1050.17 1050.17 Package including Engineering, Erection, Civil Works, Taxes and 4. Balance of Plant including 927.40 895.06 783.57 Engineering, Erection, Civil Works, Taxes and 5. Duties. Spares for BTG Package. 0.11 0.11 6. Non-EPC. 337.31 285.56 204.60 7. Start-Up Expenses 31.68 15.00 0 7. Power and Water for 32.57 32.57 32.10 Construction. 8. Consultancy and 54.13 11.03 Engineering charges 9. Pre-operative Expenses 186.55 126.56 74.04 10. Insurance 16.56 16.56 16.56 11. Capital Cost excluding 2760.55 - 2269.18 IDC & Financing Charges Page 2 of 98 IA NO. 136 OF 2020 IN APPEAL NO. 41 OF 2020 12. Interest During 1474.84 1455.77 777.50 Construction (IDC) 13. Financing Charges 31.99 31.99 11.69 14. Total Capital Cost 4267.38 4103.83 3058.37




power

Tata Power Delhi Distribution Ltd vs Delhi Electricity Regulatory ... on 28 February, 2020

1. The present Execution Petition is filed by Tata Power Delhi Distribution Page 1 of 25 EP No.09 of 2016 in A. No. 171 of 2012 Limited ("TPDDL/Petitioner") for execution of the Judgment dated 10.02.2015 passed by this Tribunal in Appeal No. 171 of 2012. The said Appeal was filed by the Petitioner challenging the tariff order dated 13.07.2012 passed by the Delhi Electricity Regulatory Commission ("Delhi Commission/Respondent") in Petition No. 05 of 2012 whereby, the true up of expenses of the Petitioner for FY 2010-11 and ARR for the Control Period FY 2012-13 to FY 2014-15 were determined. By the said judgment this Tribunal has inter-alia decided as under:-




power

Tata Power Delhi Distribution ... vs Ntpc Limited & Anr on 28 February, 2020

1. The relevant Tariff Regulations - Central Electricity Regulatory Commission (Terms & Conditions of Tariff) Regulations, 2014 (hereinafter referred to as "Tariff Regulations 2014") - in so far as they govern the obligation of the procurer of electricity to pay to the generating company for the supply received do not define or specify the "due date" for such payment. The Regulations do make provision for incentive for timely payment, the rebate admissible being subject to gradual decrease over the period specified also specifying surcharge leviable for late payment. As is the usual practice in the power industry, the Power Purchase Agreements (PPAs) contain stipulation, inter-alia, for Letter of Credit (LC), the terms and conditions settled by the parties indicating the event on which such LC can be encashed. It is the contention of the Appellant (Distribution Licensee - Procurer) that the period specified in the Regulations for rebate to be availed by payment of the bill for supply of electricity should also be treated as the period within which such payment can be legitimately insisted upon, the end of the said period being "due date" prior to which the LC cannot be invoked. The PPA which was entered upon between the parties herein carries a stipulation that the payment of the periodic bill (raised on Appeal No. 26 of 2018 & IA No. 131 of 2018 Page 2 of 24 month-to-month basis) is to be made by the last bank working day of the month in which it is raised, described as the "due date". It is also the contention of the Appellant that this stipulation (as to due date) runs contrary to the Tariff Regulations providing for the incentive (rebate) for timely payment (within 30 days), and the liability for late payment surcharge (LPSC) and, consequently, the PPA will have to be enforced only after being aligned and brought in line with letter and spirit of the Regulations.




power

Indian Captive Power Producers ... vs Gujarat Electricity Regulatory ... on 2 March, 2020

1. The present appeal has been filed by Indian Captive Power Producers Association (ICPPA) (Appellant) against the daily order dated 01.02.2019 ("impugned order") passed by the Gujarat Electricity Regulatory Commission ("Respondent Commission") in Petition No. 1672 of 2017, preferred by the Appellant. Vide the present appeal, the Appellant is seeking necessary directions for expediting the proceedings in Petition No. 1672 of 2017 preferred by the Appellant. Under the aforesaid Petition, the Appellant is seeking amendment of the provisions of the Gujarat Electricity Regulatory Commission (Terms and Conditions of Intra-State Open Access) Regulations, 2011 ("GERC OA Regulations, 2011") as detailed therein. However, even after a lapse of more than 2 years, the Respondent Commission has failed to hear the Petition on merits, thereby leading to a delay in deciding the said case.




power

Swasti Power Limited vs Uttarakhand Electricity ... on 2 March, 2020

1. The present Appeal has been filed by the Swasti Power Limited ("Appellant") under Section 111 of the Electricity Act, 2003 ("Electricity Act"), challenging the legality, validity and propriety of the Uttarakhand Electricity Regulatory Commission's ("State Commission / Respondent No.1") Order dated 21.10.2015 in Petition No. 08 of 2015 ("Impugned Order") whereby the State Commission despite coming to the conclusion that the Respondents are in breach of their obligations towards construction of 220/33KV sub-station at Ghansali or in strengthening/augmentation of the existing 33KV evacuation system had erroneously dismissed the Petition filed by the Appellant while holding that there is no specific condition under the Power Wheeling Agreement dated 30.09.2005 and Power Purchase Agreement dated 03.07.2009 executed between the parties, under which the Appellant could be compensated for the loss of generation due to inactions of the Respondent No. 2 & 3.




power

Zamil Infra Private Limited vs Haryana Power Purchase Centre ... on 6 March, 2020

1. The dismissal of the claim brought before the Haryana Electricity Regulatory Commission (the Commission) under Section 86(1)(f) of the Electricity Act, 2003 for recovery of Rs. 76,61,606/- on account of "deemed generation" against the Respondent Discom, registered as case No. HERC/PRO-69 of 2017 "for want of prosecution" by order dated 16.01.2019, followed by dismissal of the prayer for Appeal No. 75 of 2020 Page 2 of 6 restoration of the said case by order dated 25.04.2019, has led to the present appeal being instituted before us.

2. We have heard the learned counsel on all sides and have gone through the record. We are of the view that the appeal must be allowed. We set out our reasons hereinafter.




power

Adani Power Maharashtra Limited vs Maharashtra Electricity ... on 11 March, 2020

1. The brief facts that led to filing of the present appeal are as under:

3

In terms of guidelines issued by Ministry of Power (MoP) for determination of tariff by bidding process for procurement of power by distribution licensees, on 18.05.2009, Respondent No.3- MSEDCL issued a request for proposal for procurement of 2000 MW (+30%-20%) for a period of 25 years on long term basis. In that process, the following bidders were qualified:

i. Emco Energy Ltd. ( 200 MW @2.879 Rs/kWh) ii. Rattan India Power Ltd. (Amravati) ( 1200 MW @ 3.260 Rs/kWh) iii. Adani Power Maharashtra Ltd (1200 MW @ 3.280 Rs/kWh) iv. Rattan India Power Ltd. (Nashik) (950 MW @ 3.450 Rs/kWh v. Wardha Power Company Ltd. (675 MW @ 3.620 Rs/kWh)




power

Madurai Power Corporation ... vs Tamil Nadu Electricity ... on 12 March, 2020

1. These two matters have come up against almost identical backdrop of proceedings recorded by Tamil Nadu Electricity Regulatory Commission (hereinafter referred to variously as "TNERC" or "State Commission" or "Commission"), the Appellant in first captioned appeal being Madurai Power Corporation Private Limited, which was the petitioner in D.R.P. No. 19 of 2012, the second captioned appeal having been instituted by Samalpatti Power Company Private Limited, petitioner in D.R.P. No. 16 of 2012.

2. It appears that the said two petitions had come up for consideration before the State Commission around the same point of time, the hearing having been concluded, the orders having been reserved by similar proceedings recorded on 21.12.2018. Noticeably at that stage, the State Commission was functional in full strength with the Chairman and two Members in position. Before orders could be passed in either of the said matters, one of the members (Mr. G. Rajagopal) Appeal No. 127 of 2019 and Appeal No. 146 of 2019 Page 3 of 8 demitted office in January, 2019. Meanwhile, certain written submissions had been placed on record by the parties which were respondents before the State Commission (respondents in these appeals as well). Along with the said written submissions, certain documents were submitted to which exception was taken by the appellants primarily on the ground that it was new material, taking on board the same amounting to (as per their contention) amendment of the pleadings, it being statedly impermissible at the stage at which it had been tendered for record. Since the Registry of the Commission seems to have returned such material upon objections being taken, the respondents herein were constrained to file applications - i.e. IA No. 1 of 2019 in the first captioned matter and IA No. 2 of 2019 in the other matter.