hy

allegro schematic Hierarchy

Hello, I need to ask a question regarding hierarchy in allegro schematic. I have created one but now i need to make changes to one section so that its not reflected into the other?




hy

Why the Autorouter use Via to connect GND and VCC pins to Shape Plane

Here are two screen capture of Before and After Autorouting my board. Padstacks have all been revised and corrected. The Capture Schematic is correct. All Footprints have been verified after Padstack revision. a new NETLIST generation have been done after some corrections made in Capture. I have imported the new Logic. I revised my Layout Cross Section as such: TOP, GND, VCC, BOTTOM. Both VCC and GND shapes have been assigned to their respective logical GND and VCC Nets (verified). Yet, I still have the Autorouter to systematically use extra vias to make GND and VCC connections to the VCC and GND planes. Where a simple utilisation of the part padstack inner layer would have been indicated. What Im I missing ?




hy

Why a new Package update generate DRC error after waiving ?

I've redesigned a custom TO220FLAT Package

First I created a TO220shape.ssm  with PCB Editor. Then I created a surface mount T220build.pad in Padstack Editor using TO220shape.ssm. Then I created a TO220FLAT.psm in PCB Editor. I placed 3 Connect pins and 9 Mechanical pins for the TO220 TAB, using standard through-hole pads for better current handling.

Adding those Mechanical pins created many DRC errors caused by the proximity of those pads attached to the TO220shape.

Thru Pin to SMD Pin Spacing (-200.0 0.0) 5 MIL OVERLAP DEFAULT NET SPACING CONSTRAINTS Mechanical Pin "Pad50sq30d" Pin "T220build, 2"

I corrected the situation (so I though) by Waiving those DRC errors, thinking that they could not cause any problem and because that’s what I want, i.e.: 9 through-holes under the TO220 device. The idea being that when this device is mounted flat on the PCB it could carry lots of current via 9 pads that could make a good high current conductor to inner layers.

I then saved the Package and updated all related footprint schematic parts  in Capture. Created a new Netlist. Then I imported the new logic into PCB Editor to reflect that change. When the File > Import > Logic is finished I get no feedback error! (which, for me is a substantial achievement in itself)

Now, in the Design Window I see all those DRC errors popping up again, despite the fact that I waived those DRCs back in the Padstack edition. If I run a Design Rule Check (DRC) Report I will see all those DRC listed again. Now, I understand that I can go ahead and waive all those DRCs (100 in total) but I’m thinking there is got to be a better way of doing this.

Please, any advise is welcome. Thanks

 




hy

করোনাযুদ্ধে নয়া অস্ত্র- Hydroxychloroquine, করোনা চিকিৎসায় কীভাবে এটি ব্যবহার করা যেতে পারে ? জেনে নিন




hy

News18 Urdu: Latest News Hyderabad Urban

visit News18 Urdu for latest news, breaking news, news headlines and updates from Hyderabad Urban on politics, sports, entertainment, cricket, crime and more.





hy

FreeBSD Security Advisory - FreeBSD-SA-18:14.bhyve

FreeBSD Security Advisory - Insufficient bounds checking in one of the device models provided by bhyve(8) can permit a guest operating system to overwrite memory in the bhyve(8) processing possibly permitting arbitrary code execution. A guest OS using a firmware image can cause the bhyve process to crash, or possibly execute arbitrary code on the host as root.






hy

Satnav Spoofing Attacks: Why These Researchers Think They Have The Answer




hy

Steganography Meets VoIP In Hacker World




hy

Hyperion Runtime Encrypter 2.0

Hyperion is a runtime encrypter for 32-bit and 64-bit portable executables. It is a reference implementation and bases on the paper "Hyperion: Implementation of a PE-Crypter".




hy

Hyperion Runtime Encrypter 2.3

Hyperion is a runtime encrypter for 32-bit and 64-bit portable executables. It is a reference implementation and bases on the paper "Hyperion: Implementation of a PE-Crypter".









hy

RSA BSAFE Crypto-J Cryptography Failure

RSA BSAFE Crypto-J versions prior to 6.2.2 suffer from improper OCSP validation and PKCS#12 timing attack vulnerabilities.




hy

We Asked Def Con Attendees Why People Are Still Getting Hacked




hy

FreeBSD Security Advisory - FreeBSD-SA-19:16.bhyve

FreeBSD Security Advisory - The pci_xhci_device_doorbell() function does not validate the 'epid' and 'streamid' provided by the guest, leading to an out-of-bounds read. A misbehaving bhyve guest could crash the system or access memory that it should not be able to.




hy

FreeBSD Security Advisory - FreeBSD-SA-19:21.bhyve

FreeBSD Security Advisory - The e1000 network adapters permit a variety of modifications to an Ethernet packet when it is being transmitted. These include the insertion of IP and TCP checksums, insertion of an Ethernet VLAN header, and TCP segmentation offload ("TSO"). The e1000 device model uses an on-stack buffer to generate the modified packet header when simulating these modifications on transmitted packets. When TCP segmentation offload is requested for a transmitted packet, the e1000 device model used a guest-provided value to determine the size of the on-stack buffer without validation. The subsequent header generation could overflow an incorrectly sized buffer or indirect a pointer composed of stack garbage. A misbehaving bhyve guest could overwrite memory in the bhyve process on the host.





hy

Hydra Network Logon Cracker 8.9.1

THC-Hydra is a high quality parallelized login hacker for Samba, Smbnt, Cisco AAA, FTP, POP3, IMAP, Telnet, HTTP Auth, LDAP, NNTP, MySQL, VNC, ICQ, Socks5, PCNFS, Cisco and more. Includes SSL support, parallel scans, and is part of Nessus.




hy

Hydra Network Logon Cracker 9.0

THC-Hydra is a high quality parallelized login hacker for Samba, Smbnt, Cisco AAA, FTP, POP3, IMAP, Telnet, HTTP Auth, LDAP, NNTP, MySQL, VNC, ICQ, Socks5, PCNFS, Cisco and more. Includes SSL support, parallel scans, and is part of Nessus.






hy

Why Big ISPs Aren't Happy About Google's Plans For Encrypted DNS





hy

Editorial view: Why FDI is no longer about job creation

The documentary "American Factory" tells us communities need to go beyond the job creation narrative when it comes to attracting foreign investment. 




hy

View from Asia: why Asia needs to nurture its tourism offering

Asia outstrips the world for tourist arrivals and is still experiencing growth. Constant maintenance and upgrade are essential to maintain this lead.




hy

Why mixing wine with tourism could pay off for Moldova

Moldova's wine industry has gained some international recognition but the country remains largely untroubled by tourists, a combination that is enticing some foreign investors.




hy

In quest for bigger batteries, California mulls pumped hydro

As the sun sets on California’s solar farms, a backup energy source deep in the Sierra Nevada Mountains springs to life.




hy

President inaugurates Bolivia’s 69-MW San Jose II Hydroelectric Plant

Bolivian President Evo Morales has inaugurated the 69-MW San Jose II Hydroelectric Power Plant in the municipality of Colomi, department of Cochabamba.




hy

Statkraft announces plans to build 51.6-MW Los Lagos hydropower plant in Chile

Statkraft announces it has decided to start construction of the 51.6-MW Los Lagos hydropower plant in Chile. The construction is planned to commence in August and completion is scheduled for second half of 2022.




hy

Hydrogen is the fuel of the future. For real this time, IEA Says

Hydrogen, which has been touted as the fuel of the future much of the past five decades, may finally be on the verge of converting its potential to reality.




hy

Corani seeking financing to develop 147-MW Banda Azul hydro project in Bolivia

Jose Maria Romay, general manager of Corani (a subsidiary of Ende), has announced the company is seeking financing from Latin American development bank CAF and French development agency AFD for the 147-MW Banda Azul hydro project.




hy

Too much water or too little: hydropower fights wild weather

The Kariba Dam has towered over one of Africa’s mightiest rivers for 60 years, forming the world’s largest reservoir and providing reliable electricity to Zambia and Zimbabwe.




hy

The failure of privatization in the energy sector and why today’s consumers are reclaiming power

Back in the 1980s and 1990s, the twin forces of privatization and deregulation of public infrastructure services ascended to a global paradigm of progress and development. Government management of services such as telecommunications, transportation, water, and energy was deemed inefficient, underperforming, and monopolistic. Private industry – accountable to the profits and losses of an open market and, thus, believed more efficient than government – was proclaimed the better way for consumer choice and a more efficient use of taxpayers’ expenses.




hy

Ontario Power Generation to buy U.S.-based Cube Hydro

Ontario Power Generation (OPG) has entered into an agreement to acquire Cube Hydro, an operator of small and medium-sized hydropower facilities in the northeast and southeast U.S.




hy

Massachusetts approves contracts for hydroelectricity through NECEC project

The Massachusetts Department of Public Utilities has issued an order approving long-term contracts for 9,554,940 MWh annually of hydropower between H.Q. Energy Services (U.S.) Inc. and the Commonwealth’s electric distribution companies through the New England Clean Energy Connect 100% Hydro project (NECEC Hydro).




hy

Clean Power Alliance signs PPA for 12-MW Isabella small hydro project in California

The Clean Power Alliance (CPA) has signed three long-term power purchase agreements, including two new solar projects and one existing small hydro project.

 




hy

LIHI certifies two low-impact hydroelectric facilities

The Low Impact Hydropower Institute recently announced it had awarded low-impact certification status to two hydroelectric facilities:




hy

HydroVision International kicks off in Portland, Ore., U.S.

The HydroVision International event is now under way in the Oregon Convention Center in Portland, with more than 3,000 hydropower professionals from around the world coming together for four days of learning and networking.




hy

Farmers Irrigation District hydropower facility offers sustainable solution to a growing challenge

On Monday, July 22, about 30 HydroVision attendees visited the beautiful Hood River Valley outside of Portland, Oregon to tour in-conduit hydropower projects and learn how modernizing irrigation districts is a sustainable solution to help combat a changing climate.




hy

The Lewis River Merwin Dam: harvest, habitat, hatcheries and hydro

On Tuesday, July 23, about 30 HydroVision attendees had to privilege of touring the 136-MW Lewis River hydropower plant located at the Merwin Dam in Ariel, Washington. The dam was constructed in 1931 and has four penstocks, which today feed three turbines. The turbines were installed in 1931, 1949 and 1958, respectively. The fourth penstock, which was the focus of much of the tour, is for fish passage.




hy

Envisioning the future of hydropower: What do you see?

On Tuesday, July 23 at the HydroVision International keynote, Vice President Marla Barnes asked the audience to close their eyes and envision their next vacation. “Are you sitting on a beach? Are you packing your family into the car for a wild adventure? What do you see,” she asked.




hy

GE Renewable Energy announces two hydropower services contracts in the US

GE Renewable Energy announced at HydroVision that it has signed two hydropower contracts in the U.S. one for FirstLight’s Northfield Mountain project and one for PG&E’s Caribou One hydropower station.




hy

Energy CEOs extol virtues of hydropower while bemoaning its lack of public support

Last week at the HydroVision International plenary session, a panel of three CEOs — Darrel T. Anderson, President and CEO IDACORP and Idaho Power, Mitch Davidson, CEO and Managing Partner, Brookfield Renewable Power, and Paul Jacob, President and CEO, Rye Development — along with moderator Elizabeth Ingram, Content Director, Clarion Energy, discussed both the merits and the challenges of hydropower development in the United States and Canada.




hy

The hydrocarbon era’s spectacular end

Dustin Yellin, a Brooklyn, N.Y.-based artist whose intricate 3D photomontages adorn the likes of New York’s Lincoln Center, wants to draw your gaze to climate change. Not in a subtle way, either. He plans to stand an oil supertanker on its end in the ground—a structure soaring 1,000 feet into the air.